Page 1 of 1

Increasing selector sum24h to say sum30h?

Posted: Mon May 09, 2016 11:42 am
by Mattk
Would it be possible to increase the selector sum24h to sum30h or even sum48h without over stressing the process?

Reason? In this country the rainfall reporting period/s are 1) 24 hour period to 9am and 2) the 6 hours to 3pm with 3pm being one of the main daily reporting times. For a single email report at 3pm the 6 hours to 3pm is all good and with something like [rain0total-sum30h]-[rain0total-sum6h] would give the 24 hour rainfall to 9am.

Or is there another way to achieve this?